Wednesday, January 15, 2014

FAL - Q1 Goals

Finish Along 2014

I may have been shockingly unproductive last time I joined the Finish Along but new year, new start.  Right?  This year the amazingly talented Katy will be hosting the linky parties and, as I know she'll make all sorts of snide comments if I don't finish something, I figure that this will be just the motivation I need to get moving.   Hehehe. ;)

So, here's my list -

1. A Star is Born quilt 


I do so enjoy adding a gimme to my list, if only to prove to myself that I'm not a complete failure.  This baby quilt is currently sitting next to me waiting to have the binding hand sewn - a job I plan to start later today.  ;)


2. Pixelated Heart quilted wall hanging 


This littlie was inspired by December's Le Challenge theme - Precious.  I plan to make it into a wall hanging for bub's room.


3. Baby's Square in Square quilt


Speaking of bub, I also need to get this quilt finished before she arrives.  Borders, basting, quilting and binding.  Um, yeah, I can do that.  Like totally.  ;)


4. Donkey quilt


Yes, this one is truly embarassing - but I have to include it. One day, one day.


5. BABY!



Lastly, my greatest WIP to date - our baby girl.  She's due on 30th March so should be here before the linky party closes on 6th April (well, she'd better be!).  Whether I get to blog then or not is another story though.  ;)


Well, those are my most pressing WIPs... though I also have a looooong list of projects that I'd like to start and finish within the next few months.  You know, things like: fabric baskets, another baby quilt, thank you gifts, something for me.  Oh, and the sewing room and nursery need to get done too.  Ha!  How's that for optimism!? 

What are you hoping to have finished this quarter?

E.

Tuesday, January 14, 2014

Elephant Library Bag

I know, I know that title isn't exactly inspired but I'm not feeling very creative at the moment so it'll have to do.  Sorry!  I do, though, think that it is high time I blogged about this little library bag - which I finished over a month ago for my friend's then-nearly 1 year old darling daughter.


I modeled the size and shape after this library bag so it just consists of a simple tote construction with a pocket on the front.


As you can see, I chose very girly-girl fabrics and then couldn't resist adding a little elephant applique to jazz things up.  I'm definitely in an elephant loving phase at the moment.


That's it basically.  It was gifted along with some fun little board books, but I can totally see it being used to carry around all sorts of precious goodies, as Miss N's imagination grows.  I hope she likes it!

E.
Sew Cute Tuesday

Linking up to Sew Cute Tuesday over at Blossom Heart Quilts.
 
MAKING CHRISTMAS 2013


Yes, this was also a finish from my Making Christmas list. To see the final breakdown, click here.

Wednesday, January 8, 2014

The Final Countdown

Since returning from our Christmas break I've been slowly but surely getting back into the swing of things - and am thrilled to be able to finally show off the "finished" top for my bubba's quilt.


I have LOVED making these Square in Square (also called "economy") blocks.  I used this template but you can also find a non-paper pieced tutorial here on Rita's blog.  In fact, there is currently an informal QAL being run on Instagram - check out #economyblockalong to see all the amazing creations (and possibly join in yourself!).


I initially didn't plan to make this an iSpy quilt - or worry about fussy cutting - but quite a few pieces of cuteness did manage to sneak in and I adore those little touches.  A few of my favourite blocks include:



LOVE those seahorses and little scooter kids!  Huge thanks to Jess for generously sharing her scraps.

Now, earlier in my post I did say "finished" top as I'm still considering adding a border, a la this quilt.  I think it will provide the perfect frame, whilst also giving a little more length and width (currently she measures 52" x 40 1/2").  Typically, though, I can't quite decide what colours to use so I might just be asking my IG peeps for advice in the coming days.  You have been warned.  ;)

Lastly, before I run, I've had a few people ask lately how bub is going and where we're at, so I thought I'd give a quick little update.  As of last Sunday I am 28 weeks (due 30 March 2014) which means I'm into the final trimester.  Whoop!  Of course, this is an exciting milestone for me and I'm soooo looking forward to counting down these final weeks until we get to meet little Miss.

28 weeks

I am already feeling huge which is a worry for things to come (ha!)... but, honestly, besides from a few days here and there feeling sick or in pain, I've had a very cruisey time so far and count myself very, very lucky.  Fingers cross things continue.  ;)

So that's where bub and I are currently at.  It is such an amazing and exciting time and I am loving it.  Thanks to you all who have been sending lovely messages and/or have been acting as a sounding board.  I truly appreciate the love!

E.

WIP Wednesday at Freshly Pieced

Linking up with WIP Wednesday at Freshly Pieced.

Thursday, January 2, 2014

Making Christmas - The Finale

MAKING CHRISTMAS 2013

Hellooooo.  I hope you all survived the crazy Christmas and New Years period.  Hubby and I had a lovely break in Adelaide, South Australia, with his family but we're now back home and looking forward to a HUGE year ahead, with hopefully lots of sewing, work around the house and, of course, special moments galore with baby girl.  Exciting!!

Before all that, though, I thought I'd better do a final check over my Making Christmas list - just to see how I did.  Admittedly not all was completed but I am rather happy with how I went.

Here's the final summation...

1. Robot Embroidery Library Bag

FINISHED!

BOOK BAG - Duck, Duck, Robot

As the intended recipient of this book bag was born just 5 days after another bub in the same group of friends, I also thought that I'd better make a second bag for baby #1.

Girl's library bag with elephant applique
Blog post to come
UPDATE 14/1/14 - Blogged here

Success!  I admit, I am having a bit of a love affair with elephants at the moment so I just couldn't resist.

These bags have both been gifted for Christmas, with some gorgeous board books.

2. Personalised Cushions / Pillows

FINISHED!

Yes, just the one, but considering that this listing was always a maybe-but-probably-won't-happen, I'm pretty happy with that.

3.  Kindle Cover

FINISHED!

Unfortunately I don't have pictures of this finish (yet) as it was a last minute effort the night before my early Christmas celebrations with the family.  I know, I know, that sounds really dodgy but please believe me - I did get it done and the Kindle fits inside nicely and my Mum is happy.  True story!  :)

4.  Bear Paw Quilt

FINISHED!

Paddington's Paws quilt

5.  Toffee Shards Quilt

FINISHED!

Toffee Shards quilt

6.  Wonky Stars Quilt

*cough*

Sad face.

7.  Softies for Mirabel

I am terrible, horrible, awful but my Softies for Mirabel project just didn't happen this year.  I know, disgusting.  Sorry kids!  I will have to make it up with extras next year.  :(

8.  Reorganisation of my Sewing Room

Yeah, this didn't happen BUT it will very soon.  We have plans for some new shelving and a new layout.  I am soooooooo excited, it's quite ridiculous.  Stay tuned.



Phew!  Not bad, if I do say so myself.  

Now I'd better catch up on my blog reading - you guys have been busy while I've been away!

E.

MAKING CHRISTMAS 2013


I missed the last link up for Making Christmas - but that's ok.  Huge thanks to Janine and Rebecca for hosting this wonderful event.  I love that it kept me accountable and on track!  Thanks lovely ladies!